Building facilities and comfortable working Space.
Spacious working area, bright lighting, comfortable air conditioning, effective sound proof devices, etc. All of these are essential for a productive work. To meet such needs, Shinjuku Center Building is equipped with the following facilities and structures.
[Office space] [Building specifications]


Office space

Office space
floor central core central core Module design Sound proof design Air conditioning system Hot water supply system elevator
Office floor plan


  • Floor finish

    All the office floors are designed to meet the floor strength standard of 300kg/m2. Adoption of 50mm-OA floor guarantees smooth and comfortable walk without any hollow noise or rattling noise. The design also allows space for LAN connectors and electric outlet, facilitating addition and relocation of wires and electric outlet as well.

  • floor
  • Electric capacity

    The standard electric capacity of regular offices are set at 60VA/m2 which is more than enough for an average office.

  • center core system
  • Adopted center core system

    Common space such as elevator, rest rooms, pantry, and the like are kept in the central area and is surrounded by office areas without pillars on the East, South and North sides. This arrangement ensures comfortable working environment.

  • Module design

    Floor area is divided into three-meter- units. Each unit has lighting, sprinkler, smoke detector or broadcasting speaker for emergency systems. This accommodates the user's needs of office layout.

  • Module design
  • Sound proof design

    Office space, surrounded by hallways, is free of noise as a result of the central core system confining all the noise-emitting facilities such as elevator and air conditioning system in the core area. Windows are all fixed sash windows so that they block the traffic noise on the street.

  • Sound proof design
  • Air conditioning system

    The entire building adopts clean and safe regional air conditioning system. The cold water / steam supply for air conditioning comes from a regional air conditioning plant. Using this cold water / steam supply, office floors are maintained in the most comfortable room temperature.

  • Air conditioning system

  • Hot water supply system

    Central hot water system is adopted in the rest room. Pantry within the central core area adopts steam water heater with hot water tank.

  • Elevator

    Destination floors are segmented on the ground floor as follows: 1~18, 18~31,31~43, 43~53. Eight elevators are provided for respective destination groups. A total of 32 elevators ensure smooth transport within the building.

  • Elevator

Note: These facilities are installed only on the renewaled floors. Therefore, some offce space for lease may not have these facilities. (The above specifications do not cover the entire building.)


Building specifications

    Location 25-1, Nishi Shinjuku 1 chome, Shinjuku-ku
    Landlord Tokyo Tatemono Co., Ltd.
    Architect/ Contractor Taisei Construction Co., Ltd.
    Purpose Office (partly stores)
    Site area 14,920.82m2
    Building area 3,666.97m2
    Total floor area 183,063.79m2
    Average floor area 2,669m2
    Floors 54 floors, 4 basements, 3 penthouse
    Height Highest point 222.95m, Eaves height 216m
    Structure Above ground =steel
    Basements =reinforced concrete, partly steel and reinforced concrete
    Completion October 31, 1979.
    renewal July, 1998